Returned For Some Work, Finally! (9/23/2016)

After a few weeks from some serious work, we updated some things this past weekend.  It has been a while.  Sheralee came into LV for a weekend, and then we kinda took a weekend ‘off’, just doing some maintenance type things for the next weekend.  This weekend we had a chance to get back to working on some projects.

It was a rough week for Arizona weather, and transiting to and from was not easy.  We were first hit by hurricane Paine, out of the Pacific and off the coast of Mexico.
hurricane_paine-medium

I had made it up the weekend of the 9th, but we just did some small things.  I took some good pictures Saturday night, as the sun was setting.
20160910_184639-medium 20160910_184308-medium 20160910_184248-medium

Very pretty.  Then we got up and went for a hike up the hill behind us.
20160911_081842-medium 20160911_081849-medium

You can see the ‘compound’ in each picture.  What a great ‘relaxing’ weekend.  Then Sheralee came to the ‘big city’ for a weekend, which was really nice for all of us.

This past weekend, after the rains, I made it up Friday after work.  We headed out early Saturday morning for a materials run into Prescott.

Some things I needed to work on was repairing a malfunctioning water pump and miss-behaving chainsaw.  First up, was the pump work on Saturday, once we got back.  I had purchased a new Shurflo 3 gpm pump.  I decided to go ahead and create water pump v4.0.

20160924_144357-medium

This time I decided to stay away from Pex, spigots, and anything else that was permanent.  I found some great plastic adapters that thread directly on a Shurflo pump (1/2″ M) and change to a 3/4″ garden hose thread.  Brilliant!  Why didn’t I think of this before? doh!
20160924_144410-medium

Works like a champ!  So now, I just added on some garden hose extenders and off we go.
20160924_171900-medium

* No, the lighter is not needed for the pump to work. ha.

The lighter was used for Sheralee’s new ‘instant shower’!  This thing is awesome!
20160924_171849-medium
Basically, you head up the water using a common camping propane cookstove, then pressurize the tank, and off you go.  So nice!  Thank you Mario and Ainslee!

The real projects started Saturday afternoon, and Sunday.  We purchase the materials to finish out the 2nd container framing and complete the new wood floors.

20160924_181634-medium

In the other container, we went with large plywood pieces, 1/2″ on top of 1/2″ foam insulation.

Wood Floors Part II (2/20/16)

This time we cut 6″ pieces and are using a different stain.  We cut all the pieces Saturday afternoon.  What a fun job with 2 people and a small table saw. ha!

Sunday, I finished out the framing so we could lay the new floor.
20160925_084015-medium 20160925_112957-medium

While I was doing this, Sheralee was staining  the first batch of flooring.
20160925_104944-medium

After she put a coat of polyeurathane on, we installed the first section.
20160925_152325-medium 20160925_152334-medium
I will say this, IT LOOKS AWESOME!!!!  We were so happy with the say it was turning out.  Great color, great width for the floor.  Just awesome.  We continued on with the next section.
20160925_173154-medium

This new container will be our bedroom, with the TV, wall shelving, wood fireplace, and a 53″ TV for football! ha.

We are slowly re-working the other container that will be our kitchen and eating area.
20160924_181620-medium

I think that is it for now.  Hope to have the floor done next weekend so we can finally move the bed over and get that container insulated and warm for winter!